Checking for missing content type metadata ...
This resource contains content types with missing metadata required to make it public or discoverable. Show missing content type metadata.
Click on the edit button ( ) below to edit this resource.
Checking for non-preferred file/folder path names (may take a long time depending on the number of files/folders) ...
This resource contains some files/folders that have non-preferred characters in their name. Show non-conforming files/folders.
This resource contains content types with files that need to be updated to match with metadata changes. Show content type files that need updating.
| Authors: |
|
|
|---|---|---|
| Owners: |
|
This resource does not have an owner who is an active HydroShare user. Contact CUAHSI (help@cuahsi.org) for information on this resource. |
| Type: | Resource | |
| Storage: | The size of this resource is 504.0 MB | |
| Created: | Jul 29, 2026 at 9:21 p.m. (UTC) | |
| Last updated: | Jul 29, 2026 at 10:42 p.m. (UTC) | |
| Citation: | See how to cite this resource | |
| Content types: | CSV Content |
| Sharing Status: | Public |
|---|---|
| Views: | 118 |
| Downloads: | 5 |
| +1 Votes: | Be the first one to this. |
| Comments: | No comments (yet) |
Abstract
Steady low reservoir releases increase downstream primary and aquatic invertebrate (bugs) production. These releases also reduce hydropeaking value, raise costs for hydropower customers, and reduce funds to maintain infrastructure and repay loans. This study quantifies the win-lose tradeoff between hydropeaking value and days per month of steady low releases at Glen Canyon Dam, Arizona. We estimate win-lose tradeoffs for monthly release volumes of 0.72 to 0.94 million acre-feet from March to October 2018 and 0 to 31 days. Conservative estimates indicate that steady low releases on eight weekend days per summer month in 2018 reduced monthly hydropeaking value by $0.7 to $1.1 million. We used results to design a financial instrument that gives ecosystem managers a budget to choose days of steady low releases and pay hydropower producers for lost value. One option to reduce costs is shifting days of steady low releases in July or August to spring/fall months. Next steps include discussing the proposed instrument with more U.S. Federal agencies, conducting more flow experiments, and monitoring how timing and more steady low flow days per month affect bug production. Managers may extend to other experimental releases that mobilize sediment, build sand bars, or disadvantage non-native fish.
his resource contains the following items:
+ README.md - Markdown file with documentation for this resource including directions to reproduce figures, tables, and results in the manuscript.
The README.md also describes the contents of the other folders Documents, EnergyPrices and SupportingData, Results_2014Pricing, Results_2024Pricing, Validation. These folders contain the data, models, and code.
Within the Documents folder, find the files with the latest versions of the manuscript, supplemental, and cover letter submitted to the Journal of Hydroinfomatics in July 2026.
+ Rind and Rosenberg_July2026_Revised.docx -- Word document with manuscript for the work.
+ Rind and Rosenberg_Supplementary_July2026_Revised.docx - Word document with supplemental for the work.
+ Rosenberg-BugsPayForSteadyFlows-AprilAMP.pptx - Power point presentation with overview of work presented at April 12/13, 2023 meeting of the Technical Work Group (TWG) of Glen Canyon Dam Adaptive Management Program (GCD-AMP).
+ KeyFeedbackFromTechnicalWorkGroup-April12-2023.docx - Key feedback from presentation to GCD-AMP Technical Work Group on April 12, 2023.
Subject Keywords
Coverage
Spatial
Temporal
| Start Date: | |
|---|---|
| End Date: |
Content
Related Resources
| This resource updates and replaces a previous version | Rosenberg, D. E., Rind, M. A. (2025). Bugs Pay for Days of Steady Reservoir Releases to Reduce Costs to Hydropower Customers and Sustain Funds to Maintain Infrastructure, HydroShare, http://www.hydroshare.org/resource/b5c65e50679f48dfaf0d5e86dafd9815 |
Credits
Funding Agencies
This resource was created using funding from the following sources:
| Agency Name | Award Title | Award Number |
|---|---|---|
| Pakistan Ministry of Higher Education | None | None |
How to Cite
This resource is shared under the Creative Commons Attribution CC BY.
http://creativecommons.org/licenses/by/4.0/
Comments
There are currently no comments
New Comment